Microgrid Project

Region and Country: Romania, Europe

Client: Manufacturing Factory

Project Configuration: 400kW/931.84kWh BESS (Battery Energy Storage System) + EMS (Energy Management System) + 600kW Solar System + STS (Static Transfer Switch)

Project Time: 2024

Application Solution: Industry and Commerce

Applied EMS: Power and Control Database

Applied Energy Storage System: IMEXES215 Machine Cabinet (This specifies the model of the energy storage system cabinet)

Application Services: Engineering, Consultation

Application Logic: Peak shaving, seamless switching between the grid and the energy storage system, load transfer, and power quality adjustment