Category: Microgrid Project
Region and Country: Germany, Europe
Customer: Manufacturing Factory
Project Configuration: 1000kW/2150kWh Energy Storage System + EMS + Existing Solar Energy System
Project Time: 2024-2025
Application Solution: Industrial and Commercial
Applied EMS: EMS Controller Package
Applied Energy Storage System: IMAX-ES1075 Container
Application Services: Engineering, Consultation
Application Logic: Leverage grid and peak shaving (storing excess solar energy in the energy storage system for arbitrage opportunities and to reduce peak demand charges).
Correction for Application Logic in English:
“Application Logic: Utilize grid arbitrage and peak shaving strategies (storing excess solar energy in the energy storage system to take advantage of arbitrage opportunities and reduce peak demand charges).”